BRALEY ROAD BRIDGE

The Hebron Selectmen have decided to replace the bridge with a timber style bridge.  Holden Engineering has been chosen for the project.

 The pictures below are bridges that Holden Engineering designed.  The bridges are similar to the bridge design that was chosen for the replacement bridge for Braley   Road.

Available at the Selectmen’s Office is the general plan and profile of the proposed location of the new Braley Road Bridge.  This plan shows the proposed location of the temporary bridge, elevation changes to the Braley Road and the proposed location of the new bridge. 

Hancock, NH
Tannery Hill bridge

Wilmot, NH
Campground Road bridge